Font Size: a A A

The Investment Feasibility Analysis Of Shenyang Zaohua Sewage Treatment Plant BOT Project

Posted on:2013-05-30Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y ZhaoFull Text:PDF
GTID:2251330401462109Subject:Business administration
Abstract/Summary:PDF Full Text Request
Zaohua Area,located in the east of SHENYANG’industrial area, is one of the nearest district from the city center.With the land use changing in Zaohua Area and the arrival of enterprises and population increasing constantly,the quantity of wastewater effluent also increased However,There have no one sewage treatment plant in Zaohua Area. At present,the sewage discharged directly into XIAONAN river and through the Pu River flowing into the Liaohe River without treatment,which not only influence environment around Zaohua Area,but also cause serious pollution problems on the Liaohe River. Consequently, It’s very urgent to set up a sewage treatment plant in Zaohua area. Shenyang municipal Party committee, city hall on wastewater pollution urban environmental problem seriously very much, have nature area sewage treatment plant construction project as a key project of Shenyang City, in order to ensure the harmonious development of economy and environment.This article systematically analyzed the feasibility of project investment theory, content and methods firstly. Then,comprehensively described on the investment of X company, including the company’s situation,the project content overview and project background information. Later, it did a market analysis and project investment analysis about X companies facing the proposed investment project.In this analysis,the author used statistical methods, comparative methods to analyze comprehensively the feasibility of project implementation, sewage industry market situation, market capacity, technical scheme and management ability. Then adopting the method of combining the dynamic evaluation with the static evaluation, the paper analyzed investment project cost, benefit and uncertainty. On this basis, the dynamic evaluation and the method of combining the static evaluation, investment project economic feasibility analysis, including:cost analysis, benefit analysis and uncertainty analysis. Finally is to invest Shenyang Yuhong nature of BOT project of sewage treatment and control measures of risk analysis, from the point of completion risk, environmental risk and financial risk is discussed from three aspects, and put forward the feasibility study conclusion and suggestion.Through the study on the economic benefit, social benefit, environmental benefit of sewage treatment BOT project investment,we can conclude that Shenyang Zaohua sewage treatment BOT project at present the macro economic environment running well, Shenyang city sewage treatment industry develops rapidly, the market condition is better, in favor of sewage treatment projects. Project investment financing source for all the enterprises, the financial indicators to meet current national project evaluation index requirement, project investment basically has acceptable profitability, profit and loss balance point and sensitivity analysis of the critical point of normal, a project can resist market risk.Shenyang Zaohua sewage treatment BOT project has great economic benefits, social and environmental importance, so the project investment is feasible.
Keywords/Search Tags:Zaohua sewage treatment plant, BOT project, Feasibility analysis
PDF Full Text Request
Related items