Font Size: a A A

Research On The Quality Management Of New Builted Hydrogen Plant For A Company

Posted on:2013-02-08Degree:MasterType:Thesis
Country:ChinaCandidate:M ZhangFull Text:PDF
GTID:2311330512471398Subject:Project management
Abstract/Summary:PDF Full Text Request
Currently,the keen competition in the steel industry,Acompany in order to ensure the normal use of the user,the company's hydrogen balance,reasonable downtime for equipment maintenance and repair of hydrogen production unit,to better meet the customers' increasing requirements,A company decided to build a new Hydrogen Plant.This article taking the new Hydrogen Plant for the carrier of object,project guided by the basic principles of quality management,according to practical projects around the quality objectives of the project,research project quality planning,quality assurance,quality control,and verify that the basic procedures and methods.Project quality planning process,to identify and organize the customer needs,quality problems in manufacturing jobs in the past on the basis of an in-depth analysis of the causes,successfully users needs and improvement measures of quality problems into project design requirements.Project human resources planning,has established a high quality item quality team;according to the production process,to plan the project equipment,process control,formed to meet the needs of the project and the quality of equipment configuration and system control.In the course of project implementation,project design,equipment manufacturing,construction,equipment installation and commissioning,project acceptance process to establish the regulatory requirements and processes.Through the organization of project design review,equipment tests,installation,acceptance criteria,as well as debugging scenarios,providing support and protection for project implementation.Finally draw the company quality management procedure,combined with the actual project to improve and refine,through the implementation of project quality control,to carry out quality verification,preparation of project performance,achieved the expected objectives and requirements of project quality.Through the project,future development has provided valuable experience for other projects.
Keywords/Search Tags:quality management, quality implementation plan, quality assurance, quality control and verification, hydrogen production
PDF Full Text Request
Related items