Research On Quality Control Of Tamtsag Basin-2 Apricot Oilfield Surface Engineering Construction Projects

Posted on:2021-01-22Degree:MasterType:Thesis
Country:ChinaCandidate:D C LiuFull Text:PDF
GTID:2381330605968353Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of China's economy,the demand for oil continues to increase,which requires oil production enterprises to accelerate production,so as to promote the oil field surface production capacity construction project construction speed and level continuously improved.Oilfield surface production capacity construction projects refer to all kinds of oil and gas gathering and transportation pipelines,long-distance pipelines,storage tanks,transfer stations,combined stations,oil and gas treatment stations and auxiliary facilities built on the oil field surface.The quality control of oilfield surface production capacity construction project not only has an important impact on the project itself,but also has an important impact on oil field safety production.Oilfield surface production capacity construction project has high technical content,complex process,large amount of engineering,long implementation period and high quality requirements.In this paper,by studying the quality control theory of domestic and foreign projects and the status quo of the quality control of oilfield surface production capacity construction projects in China,through the analysis of the characteristics of oilfield surface production capacity construction projects,the factors affecting project quality control are comprehensively analyzed.Daqing oilfield Engineering Construction co.,ltd.is responsible for implementing engineering-procured-construction(EPC),that is,the general contractor is entrusted by the owner to carry out the whole process or several stages of the design,Procurement,Construction and trial operation of the project in accordance with the contract.Usually engineering general contracting enterprises under the condition of price contract,the quality of the contracted projects,safety,cost and schedule is responsible for)tower ii joint station project construction as an example,on the basis of the tower of the participation of two centralized monitoring station project personnel quality used machinery and equipment,monitoring equipment quality,project implementation,process method,project implementation,we deeply analyzed the factors such as environment,building project quality control model,on this basis to determine the tow er 2 joint station centralized monitoring project quality control in the guiding ideology,proposed the principle of centralized monitoring station project quality control,project quality control measures are put forward.
Keywords/Search Tags:Oilfield production capacity construction projects, Quality control, Quality management system, Quality assurance measures
PDF Full Text Request
Related items