Font Size: a A A

Research On Schedule Management Of Methanol/ammonia Co Generation Complex Device In Foreign Companies

Posted on:2018-12-19Degree:MasterType:Thesis
Country:ChinaCandidate:B ZhangFull Text:PDF
GTID:2311330512967809Subject:Project management
Abstract/Summary:PDF Full Text Request
Domestic market gradually saturated, petrochemical refining equipment increasing, foreign engineering is the future trend of the development of petrochemical project construction enterprise, the petrochemical equipment manufacturing enterprises and domestic petrochemical installation enterprise must will look overseas market."Internationalization" has become a development trend of current enterprises, Chinese enterprises "going out" or "come in" for foreign companies, are involved in international project management;How to strengthen the construction of the project schedule control, it is an important subject in front of all the construction enterprises.Progress is the progress of the project implementation results, to the completion of the project task to express. In modern project management, the project task, time limit, cost organically combine to form a comprehensive index, can fully reflect the implementation of the project. 2015 June the company won the bid of the Russian methanol/ammonia production of composite device. This project has several characteristics:drawings by foreign design institute design, we are only responsible for the transformation, the difficulty of drawing schedule control; material properties and specifications of all the material of the project is in accordance with the foreign standard quasi, we need a large number of additional processing work; project of steel structure production and domestic standards and different, workers are already familiar with the work habits change the need for technical support and on-site management; project workload is huge, also need to packing a lot of, packaging and finesse to agreed that the company's manufacturing system and habits has been unable to meet the requirements. This article from the drawings, materials, technology, construction and management of several aspects of the work breakdown, responsibility assignment, linear maps and key paths and other ways to solve the project encountered several problems. Now there are a lot of Companies in the country to do foreign projects, may also encounter the same problem, making this paper has a certain guiding significance, other companies and other projects can be used as a reference.
Keywords/Search Tags:petrochemical projects, foreign projects, construction management, schedule management, system management
PDF Full Text Request
Related items