| Since the beginning of the 21 st century,China’s pipeline construction has entered a new period of development,and the demand for green environmental protection has stimulated the construction of natural gas pipelines.In order to open up a wider range of oil import routes,China has also increased the construction of oil pipelines in the northeast and southwest.In the pipeline construction,especially in the construction of long-distance pipelines,communication engineering is one of the important components.Its main purpose is to each station of the long-distance pipeline,each RTU valve room,the oil and gas management office and the control center.The data,voice,video and other signals provide transmission channels;enable dynamic monitoring,control,simulation,analysis,prediction,scheduling and optimization of the entire pipeline operation process,realize unattended remote operation of the station and valve room and some people Watch for remote operations.The smooth transmission channel of the communication system plays an extremely important role in the safe operation and economic benefits of the oil and gas pipeline.Based on the domestic and foreign research status of risk management,the development direction is discussed,then the project risk identification,risk analysis of the project,the project technical risk response and risk control are studied.Comparative analysis of research methods in the field at home and abroad,the advantages and disadvantages of the proposed the optimization method of Delphi method of risk identification and Risk Breakdown Structure Based on the method of risk and risk based on graph method and risk matrix method evaluation and optimization strategy.The west east gas pipeline communication engineering project risk management as an example,the application of risk identification method of risk identification and draw the risk structure.The main results of this paper is to present the Delphi method,the risk breakdown structure(Delphi-RBS)method based on the construction project risk identification and optimization method is effectively applied to case analysis.At the same time,the application of risk map and risk matrix theory to the application case are compared and analyzed based on the risk map and risk matrix method the construction project risk evaluation and optimization strategy.After the above risk assessment,in the proposed risk response strategy at the same time,for each risk point of the corresponding countermeasures... |