Font Size: a A A

The XINZHAN Crude Oil Gathering And Transportation System Optimization Study

Posted on:2009-08-29Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhangFull Text:PDF
GTID:2121360278961323Subject:Oil and Natural Gas Engineering
Abstract/Summary:PDF Full Text Request
The ninth extract oil factory of Daqing Oil Field has already run near 20 year, at presenthad the big scale. Along with the oil-field development time's extension, oil facilities,produced a significant increase in liquid water, and the average single well liquid productionand oil production drop, resulting in the production of oil and energy production costs. Thereasonableness of the existing production management, how to control the production ofenergy consumption, lower production costs, so that the existing production facilities tomaximize the function of the valve block, the transit point for the production of a jointoperation of the system of co-coordinating how we can best achieve, as well as Oil productionto reduce energy consumption and cost of how much potential is the question which thecurrent oil field production technical management needs to solve and to reply.Gathering and transportation of crude oil and water injection system optimization studycan not give full play to our plant on the ground engineering management initiative, the"potential energy" works and raises my factory production system whole operating efficiency,moreover may through the fine management, raise my factory oil gas production wholemanagement level, reduces the safety in production hidden danger. At the same time, throughthe simulation software on the need for transformation of the old analog blocks, andconducive to the preparation of the plan.The single well gathering of oil is production process which collects the various oil wellsproduction oil, the gas, the water mixture through the pipeline to the measurement station, theseparation station and processing station.This his is the key link of oil field groundconstruction project. High-performance and reasonable single-well oil process is vitallyimportant to the protection of normal oil production, reduce the maximum investment projectsand reduce the production of energy.Use the gathering and transportation system optimization simulation software, to becompleted from the wellhead to the metering station to station, as well as outside the unitedpipelines and simulation of a new station in the oil gathering and transportation system to carry out an analysis of the status quo basis. Finally, use computing software to be adjustedOperation parameters of the program.
Keywords/Search Tags:Gathering and transportation system, Simulation, Optimization analysis, Adjust the operating parameters
PDF Full Text Request
Related items