Font Size: a A A

The Study Of Construction And Operation Model About Changping Distribution Automation System

Posted on:2012-07-09Degree:MasterType:Thesis
Country:ChinaCandidate:G K FanFull Text:PDF
GTID:2132330332494666Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
With China's intelligent power grid construction of extensively, distribution automation system building will have a good development opportunities。As Beijing Changping district, the exurb since 2005 began construction of distribution automation system, but for years and don't get good maintenance, failed to play system some this function and role. Through analysis of Changping district distribution network present situation, distribution automation system construction and application, and in combination with Beijing power supply company distribution automation system construction mode, combining Changping district geographic location and economic development requirements, puts forward the Changping district of distribution automation system construction proposal. As a counties, no need according to the mode of Chengqu power supply company, urban distribution network covers the whole Omni-directionally system, build a big and perfect system, on the one hand, cannot satisfy the current distribution network structure distribution automation system requirements, if an overall reconstruction requires a lot of funds, and on the other hand, the comprehensive construction distribution automation system, the operation maintenance personnel, but it cannot achieve workload enormous enhance work efficiency purpose, will become a burdensome of maintain grid. This paper suggests Changping district in the construction of distribution automation system, will all equipment and users according to their importance degree was graded, set up different grades of automation function, construction accord with the local characteristics of distribution network in Changping automation system. In addition, absorb before a few years of related experience, with the distribution automation system construction, distribution network management mode must be affected, Changping power supply company should improve the corresponding distribution network mode of operation and management, establish adaptive grid development needs of management system, to ensure that equipment and system running smoothly.
Keywords/Search Tags:Distribution Automation, Construction, Operation, Study
PDF Full Text Request
Related items