Font Size: a A A

Studies On T Gym The Project Schedule Management Based Of KBE

Posted on:2012-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:D H ChenFull Text:PDF
GTID:2132330332971762Subject:Project management
Abstract/Summary:PDF Full Text Request
The current project schedule for the common progress of the extended management, budget overruns, the key resources can not meet the necessary resources and serious problems of conflict. This article maintains that the most problem is how to take full advantage of the new information technology the most promising set up a modern enterprise management platform. New information technology for enterprise information management, internal and external efficiency of a higher demand. First, by introducing the Project Management on study abroad, put forward based on innovation KBE of Project Management concepts, the two in the Knowledge Base link established on the basis put forward to build business knowledge engineering and enterprise knowledge base systematic approach to the progress of the project management concept. Furthermore, the introduction of the definition of KBE and knowledge base systems, the development and the status quo, the research project based on the progress of KBE system management mode and support environment. Guangzhou Nansha Stadium project listed KBE-based project schedule management in the knowledge base and knowledge base system construction practices. Ideas from the building, contents, structure, function and update methods module angles, all aspects of land on the knowledge base and knowledge base system has been introduced and analyzed. Once again, to the knowledge base and knowledge base systems Practical application of project results to the method of management performance evaluation, and draw conclusions of the research. Finally, we explored ways to further promote the significance and feasibility .
Keywords/Search Tags:schedule management, KBE, knowledge, inference engine
PDF Full Text Request
Related items