Research On New Construction Feasibility Of Nierji Wind Electric Field

Posted on:2012-07-31Degree:MasterType:Thesis
Country:ChinaCandidate:Y WuFull Text:PDF
GTID:2132330332997317Subject:Project management
Abstract/Summary:PDF Full Text Request
Nierji wind electric field located at Nierji hydro-junction. The Nierji hydro-junction located at the Nenjiang River main current's middle reaches, the reservoir dam site is away from Nenjiang River mouth 585km, the dam site place is the Nenjiang River main current last canyon, clutches the Nenjiang River to flow in the broad Songnen Plain's pharynx and larynx by the mountainous area rough terrain. The reservoir left bank is Heilongjiang Province's Nehe and Nenjiang County. The dam site right bank is the Nierji town, left bank is Nehe's Erke Qian township. It is 150 kilometers away from the strategic industrial city --- Qiqihar, 29 kilometers away from the Nehe railway station, 9 kilometers away from Nierjitown. Its trasportation is convenient, and its geographical position is extremely superior. The anemography work carried on in the region including both banks of Nierji hydro-junction, Bailu village, Xingwang township, Aobao Mountain in Erkeqian town, Mahong Mountain in Xuetian town and Maoshan tree farm show that the local wind power resources within the region is rich and the development capacity is considerable. The potential capacity of the wind field in ailu village, Xingwang township is about 100MWB, in Xuetian town and Erkeqian town about 100MW, in Maoshan tree farm about 600MW. According to the Nierji wind electric field area socio-economic development and various professions long-term planning, the union wind electric field's natural condition, the resources characteristic, the construction condition, as well as the wind energy resource development use's request, the Nierji wind electric field project development mission generates electricity primarily, proper attention to both traveling benefit. Moreover, the wind is strong in Winter and Spring Nierji, so Wind-electricity generation capacity is great in the two seasons. The wind is weak in Summer and Autumn, so the Wind-electricity generation capacityi s little in these two seasons. However, Summer and Autumn are the high water seasons, so the hydropower generation capacity is great. But Winter and Spring are the dry seasons. Thus, the wind electricity generation and the hydropower generation may become complementary.This article take the Nierji wind electric field new construction project's feasibility as the research case, the full text divides into six chapters. First, the second part in introduced the research background, the research significance, the research goal, the content and in the method foundation, obtained from the project management and feasibility study's general theory, to elaborate the project feasibility analysis's primary coverage and the function, and introduced the Nierji wind electric field new construction faced at present the economic environment and the project investment's related background, elaborated the Nierji wind electric field new construction necessity and the economic significance, the construction plan and the memory scale from the domestic and foreign market situation and enterprise development's angle embarking. Third arrives at the fifth part, according to modern project management and feasibility analysis's basic principle, follows the feasibility analysis the general process, has carried on the project environment analysis and the technical analysis, based on this and proposed constructs the Nierji wind electric field new construction the concrete implementation plan, like market demand and predict that resources factor appraisal, environmental factor appraisal, power set feasibility analysis, construction feasibility analysis, investment estimate and fund raising program evaluation and so on. And has studied the project enterprise organization and the implementation plan, in has carried on the market investigation and study analysis foundation, through the project investment and the income fund estimate, as well as angles and so on fund raising plan conducts the special feasibility study to the project. And some risk analysis about the technological risks about the wind-driven generator, the power price fixed risk, the transmission project risk and the management risk has been made. Simultaneously some control measures have been obtained.Finally, has drawn the beneficial conclusion. Helps the policy-maker to make the correct decision-making, raises the investment benefit.
Keywords/Search Tags:Wind electric field, new construction, Project, Feasibility
PDF Full Text Request
Related items