Combined with the construction of Industry Process Control and Simulation Lab of NCEPU, the dissertation studies some theory problems about the electric power plant integrated automation, and tries to construct an experiment platform of electric power plant integrated automation. The dissertation first put forward author opinion about the two dimension layering architecture of the electric power plant integrated automation, then compares some control systems and their role in the power plant integrated automation large system, and analyses the principle of some methods of application data exchange. At last, on the base of theory discussion, the paper shows the system integration of experiment platform.
|