The paper makes a systemic analysis and research for the boiler using inferior coal in the electric power plant, a large resistance for the coal pulverizing system. On the basis of the research and experiment, through the theoretical calculation and analysis, this paper puts forward to the synthetic measures in technology to improve the adaptation to changes of coal for the boiler using inferior coal, and makes many synthetic treatment measures, and the separator of the coal pulverizing system in the boiler whose rated capacity 410t/h in some electric power plant. This paper puts forward to an evaluation system by utilizing a research method of the systemic engineering to optimizing the use of the inferior coal.
|