Font Size: a A A

Simulation On Arch Dam Construction And Pouring Process Design

Posted on:2006-12-28Degree:MasterType:Thesis
Country:ChinaCandidate:Y ShiFull Text:PDF
GTID:2132360182975383Subject:Structure engineering
Abstract/Summary:PDF Full Text Request
The selection and analysis of the Hydraulic Project construction parameter wereusually compared and analyzed by construction experience. Computer simulation ondam concrete construction system, which combined Hydraulic Project constructionwith modern simulation methods, turned into the scientism field, such as simulationexperimentation of construction process, numerical value analysis of constructionparameter, optimization of construction scheme. The foretime study of the concretedam construction was usually to render in a simple form, which taked macroscopicaleffect on the preliminary analysis of the schedule. In order to easily achieve thedetailed information of the dam construction process, making the simulation processand result microcosmic being closed to project construction was necessarily.The construction of arch concrete dam required high quality and intensity, whichform is arch. The different pouring-cubes were independent as well as connected.Aimed at the characteristic of the arch dam and pouring-cubes, this paper studiedsimulation on high arch dam construction and the pouring process. Its not onlyconsidered the dynamic process of construction but also provided with details ofevery pouring-cube. We can analyze information of every pouring-cube, whichpresented reason to the construction process.The system included four subsystems, such as dam-form subsystem, constructionmachine subsystem, construction controlling subsystem, pouring process designsubsystem. The rule is presented in simulation system to be used in conflicts controland combine-pouring of cranes when many cranes machine working together, it alsocan establish construction parameter and scheme resources according to different partof dam. In order to make the best of diversified resources, the system not onlyconcerned with the spacial conflict problem on concrete construction, but alsoinvolved efficiency utility of machines.Centralize data management and standardization output were introduced into thesystem, which provided great deal of reason for information of the pouring processdesign.The system verifies the construction scheme in Xiaowan Hydropower Projectand optimization scheme is proposed. It is helpful for engineering construction.
Keywords/Search Tags:Concrete-dam Construction, Computer Simulation, Pouring Process Design, Database, Xiaowan Project, Cable Crane
PDF Full Text Request
Related items