This article is base on comparison of several of Full Face Rock Tunnel Boring Machine main Parameter and it's reserve equipment ways of shaping method and parameter computation, Compares each computational method emphatically the applicable scope and the computation precision. Establishes more reasonable and the applicable scope broader entire cross section rock tunneling machine main engine host parameter computation model and the project technical parameter forecast computation model in this foundation, And in DELPHI under IDE environment through ADO technology compilation based on relations database TBM main engine host parameter and project technology parameter forecast software, Transforms the mathematical model as the direct use computation tool. For the full-face tunneling machine main engine and the reserve equipment shaping, the host parameter computation, the project construction forecast reliably provides, the accurate computation tool.
|