The Freeway Asphalt Concrete Pavement Construction Orgnize Optimal Design

Posted on:2007-03-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q ZhangFull Text:PDF
GTID:2132360215495335Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Designing all of the mark segment grows a 11 KMs,讫stake the number is a K 40+000-K 51+000.The roadbed width is a 27 Ms, the road noodles design goes driveway width to take(contain seamy side road's good luck to take) the breadth as 3.0 ms for 2×s 3.75 mses, central partitions, hard shoulder(contain outside side road good luck to take) breadth is 4.5 ms.The road noodles structure form of the contract's segment is as follows:Up north route driveway:Top layer 4 I cmACs-16s the type is airtight to go together with a bituminous concrete;Medium noodles layer 6 I cmACs-20s the type is airtight to go together with a bituminous concrete;Underneath layer 8 I cmACs-30s the type is airtight to go together with a bituminous concrete, the I AC-25 type is airtight to go together with a bituminous concrete;The grass-roots 38 cm cement stabilizes crushed stones;The bottom grass-roots 40 cms two ash stability gravel(crushed stones), total thickness 96 cms.The bottom driveway in the line:Top layer 4 I cmACs-16s the type is airtight to go together with a bituminous concrete;Medium noodles layer 5 I cmACs-20s the type is airtight to go together with a bituminous concrete;Underneath layer 6 I cmACs-30s the type is airtight to go together with a bituminous concrete, the I AC-25 type is airtight to go together with a bituminous concrete;The grass-roots 20 cm cement stabilizes crushed stones;The bottom grass-roots 38 cms two ash stability gravel(crushed stones), total thickness 73 cms.Construction project is:(A)Two ashs stabilize a gravel construction;(Two)Two ashs stabilize crushed stones bottom a basic level a construction;(Three)The cement stability class goes together with crushed stones;(Four)The bituminous concrete bottom noodles layer with medium noodles layer construction, the point works well a target match ratio, producing the match ratio design stage, producing a match to have a competition to check a stage, spreading to build experiment road segment.(Five)Bituminous concrete road noodles top the layer start construction, the point works well to press a work, insuring the neat degree of road noodles.(Six)Lay electric power, the very and subsidiary facilities of the communication pipeline;(Seven)The road good luck stone and bituminous concrete block the construction that water takes. Work to the engineering quality control measure, safety moreover, exaltation the road noodles neat degree of the measure of the technique measure, environmental protection, guarantee the work expect of the measure carried on elucidation.The basic facilities,services,and installations needed for the functioning of a community or society,such as transportation and communications systems,water and power lines,and public institutions including schools,post offices,and prisons.
Keywords/Search Tags:he superhighway, bituminous concrete, the road noodles, starts construction to organize, excellent turn a design
PDF Full Text Request
Related items