Font Size: a A A

The Research On Evaluation Method And Equipment's Reasonable Allocation Project Used For Checking Ticket In Railway Large Hub Station

Posted on:2009-05-20Degree:MasterType:Thesis
Country:ChinaCandidate:L J QinFull Text:PDF
GTID:2132360242489506Subject:Systems Engineering
Abstract/Summary:PDF Full Text Request
Railway stations checked ticketing system is an important component of railway passenger management system. The scientific and rational allocation of the seized equipment and booking a reasonable choice seized outlets, to achieve the effective flow of the stations, and increase the station operators. Since large-scale comprehensive modern transport hub stations generally have a variety of modes of transport, many related to the seizure of equipment and different outlets seized outlets, such as new rail transport Beijingnanzhan. They all requirement different types of equipment and seized seized ticket booking form. How to face the large number of dynamic flow in the complex space-station line service on the network to accept the massive complex queuing system, the rational distribution of the seized station equipment and choose the seizure ticket booking, is an important practical significance of the study.This paper combines with the Ministry of Railways to participate in research projects "railway hub planning and allocation of capacity - large modern integrated transport hub operation and management research programme," to do he research work. And with a new Beijingnanzhan as the background, it choices the major passenger railway stations Wicket hub equipment rational allocation of programme and evaluation methods for research topics.On the basis of studying in the domestic and international the status quo, first this paper systems analysis for the overall structure of the major passenger hub station ticket system. Then, on the application of queuing theory and method, based on the Witness simulation software, it has the establishment of a rational allocation of the ticket equipment simulation evaluation model. Finally, simulation models and evaluation of the performance indicators identified, the number of Beijingnanzhan wicket equipment for the rational allocation of the simulation evaluation of examples of analysis, a reasonable amount of ticket equipment configuration for the realization of Beijingnanzhan integrated and efficient transport hub optimization of operations provided a basis for decision making.
Keywords/Search Tags:Railway Large Hub Station, Check Ticket, Queuing Theory, Witness Simulation
PDF Full Text Request
Related items