Font Size: a A A

The Mechanical Contraction Technology Of Geomembrance Anti-Seepage And The Study Of Flow Construction For Bottom Of Large Area Reservoir

Posted on:2009-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:W G LiFull Text:PDF
GTID:2132360242983124Subject:Water Resources and Hydropower Engineering
Abstract/Summary:PDF Full Text Request
In recent years, there are some reservoir databases dish to impervious in engineering using the geomembrane anti-seepage system successively, obtain very ideal result. In order to insure the success that the database impervious engineering, have to promise the integrity of the geomembrane, reduce the geomembrane anti-seepage system as far as possible be mechanizing the damaged geomembrane that the construction process result in is the point of whole engineering.This text analyzed the construction craft of bottom anti-seepage system, tally up during the period of mechanizing a construction result in of breakage form and it break of reason, draw up the geomembrance anti-seepage system mechanization construction method of a set of science, make the artificial tastk and start construction the machine task combines organically on time and the space, avoiding the geomembrance result in by the construction machine break as far as possible, at each construction plane of construction brigade along the parallelism construction direction launches toward perpendicular direction turn to become several contruction plane one by one in order, let engineering all production factors inside the system get a reasonable arrangement, putting together various production factor knot in the best way, attaining work time province, the supplies resources to waste thus low, start construction quality excellent target, make to start construction the machine organize each construction a troops with the artificial homework under the condition that continuous construction utmost take to connect in the construction the process, make it become the database dish the geomembrane anti-seepage system to defend the leakage the mechanization flowing water work. So, can speed the construction progress, reduce construction period and invest, in promising the foundation of the construction quality(reduce the soil work film of damaged) exaltation construction efficiency, defend leakage mechanization a construction to have actual instruction meaning towards expanding the geomembrane anti-seepage system .
Keywords/Search Tags:geomembrane, breakage form, Sieve machinery, construction method, flow construction
PDF Full Text Request
Related items