Font Size: a A A

Research And Development On A Simulation System Of Hydraulic Engineering Asphaltic Concrete Facing Engineering Construction

Posted on:2009-12-19Degree:MasterType:Thesis
Country:ChinaCandidate:X Y XuFull Text:PDF
GTID:2132360245480205Subject:Structure engineering
Abstract/Summary:PDF Full Text Request
Reservoir asphaltic concrete Anti-seepage facing construction is a complicated system engineering, it work with a period tightly and a large scope, and it need high construction technique, what's more, its construction quality is controlled difficultly greatly with construction high-strength, in the meantime, it is subjected to some factors in the construction of the process, such as the weather condition, divide database segment the cent, the early time for asphaltic concrete, the construction means etc. These factors relationships are complex, contacted mutually with each other, which make the design and construction organize of asphaltic concrete facing engineering become heavy and some vivid work.This paper aims at the field at present our country asphaltic concrete facing construction which exists that construction level is still need an exaltation and construction progress control is difficulty etc. This paper carries on thorough overall summary and research on theories and method of the reservoir asphaltic concrete facing engineering construction, in the meantime, pointing to reservoir asphaltic concrete facing construction the process, carries on a research on dynamic simulation, researching on the reservoir asphaltic concrete facing construction process and its existent problem, providing the data and information of every aspect. This research tries to make sure to provide decision with science basis when put to the reservoir asphaltic concrete facing construction, tries to make an exaltation to comprehensive efficiency of the construction process, tries to promote the depth and accuracy of construction organize design and construction management, which insure the progress and quality of the engineering construction. This paper mainly studies contents and result as follows: (1)Analyzed completely on reservoir asphaltic concrete facing engineering construction system, including the characteristics, the impacted factors in construction process of the facing construction and various stipulation condition etc.. In the meantime, it is carried on a research on the theories and method of construction process.(2)It is built up a simulation model which can reflect the characteristics of the reservoir asphaltic concrete facing construction, and analyzed the construction movement mechanism in detail.(3) Carried out the computer choosing a scroll automatically. According to the stipulation condition and limit of scope, the computer chooses the most proper scroll to construct automatically, and compute the beginning time and completion time of work of each segment.(4) Set up the whole frame of the construction simulation system of the reservoir asphaltic concrete facing engineering and carried out that system development. This simulation developed on the Visual C++ language, using the counteract program design thought of object-orient can be operated in brief and vividly. Moreover, the result of simulation express quickly with an eye-view.In the end, it is tallied up a textual work and research result, and put forward to the place which needs an improvement and new technique development direction.
Keywords/Search Tags:The reservoir anti-seepage engineering, Event scheduling, Visual C++, Database
PDF Full Text Request
Related items