Font Size: a A A

Settlement Curve Of Site Ground Fracture In Xi'an On The Way Of Least Square Method Forecast

Posted on:2011-08-05Degree:MasterType:Thesis
Country:ChinaCandidate:X F XiongFull Text:PDF
GTID:2132360308960488Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
This paper roots in research in structure safety capability of Shanxi ministry of construction fund item. The ground fracture in Xi an is a sort of unique city geologic hazard, its area of coverage pole expand, destructibility very strong, afterwards becoming a chiefly nature calamity of Xi'an. Because of the ground fracture in Xi an is severity, at present, adopt the way of engineering required. The purpose of this paper is that security rational avail land resources at the base of ensure the building security.In this paper, the security scheme about some buildings on the site of ground fracture in Xi'an for the security required method. At the same time, there is some other content about the ground fracture in Xi'an, for example, the methods of required secure time, the urbanism method, the disposal temporary building scheme and so on. Finally, it provides a theoretical basis about using the site of ground fracture with safety in the future, with analyzing the feasibility of three projects (the family building of the Oral Hospital of Xi'an, the Eastern Waterfront building district in Xi'an).In this paper, compared with the engineering geology commonness site and site of ground fracture, differentiate from upward and downward of ground fracture. From the analysis of data and engineering example of certain house subzone engineering in Xi'an, proceed the selection of foundation of the building that enter into the main distortion of ground fracture. Gotten the feature of foundation selection on the site of the ground fracture.In consideration of ground fracture in Xi'an activity again, this paper applies Application in Economic Forecasting of Least Square Method, through the medium of Matlab software forecast the Xi'an ground fracture f6 of An dong street micro-distortion band ground settlement. On the basis of f6 site of ground fracture ground settlement status of each month actual measurement value from 1989-1991 for upward displaced block 120m to downward displaced block 30m of compartment. Forecast this site of ground fracture status for upward displaced block 120m to downward displaced block 30m of compartment in 50 years. The results showed that from upward displaced block 10m to downward displaced block 2m of compartment in main distortion settlement rate relatively bigger and different settlement phenomena greatly distinctness of this ground fracture, but beyond upward displaced block 20m to downward displaced block 5m of compartment in main distortion settlement rate substantial agreement for ground bulk settlement.From the discussion above, could adopt some security required method, in order that bump land use capability advance. Toward the building which must enter the main distortion of ground fracture, adopt right foundation lectotype scheme could virtually relieve the ground fracture destroyed.
Keywords/Search Tags:ground fracture in Xi an, site settlemengt, forecast method, least square method, Settlement curve
PDF Full Text Request
Related items