Font Size: a A A

Research On The BOT Mode In Western China Infrastructure Building For Private Firms

Posted on:2003-09-28Degree:MasterType:Thesis
Country:ChinaCandidate:J Z ChenFull Text:PDF
GTID:2156360092965909Subject:Business Administration
Abstract/Summary:PDF Full Text Request
It is very impota for the development of Westem China that our counny havebecome a member of WTO and the Westem China Development Policy have beenbring into effect. However, the deastrUctUre of Westem China has become thebottleneck of Westem China Development. It has been an imPOrtan problem forWestem China that how to driprove the infratctufC. In the old tirne, theinfrastructUre building depends on the govemrnent caPital. In the several years, theBOT mode of fOreign direct finance has aPPeared. At the same tirne this mode havesome problems in operation, so it drown on the BOT mode of private enterprises. Itis an importan exploration that private Firms enter the field of infrasAnctUre buildingby the way of BOT in Westem China. So the research on the problem of how to takepart in the BOT mode and how to avoid risk of private firms is very driPOrtan intheory and in practice.At first, this paPer discusses the imPOrtance of private firms taking part in theinLfrastrUctUre building by the Way of BOT in Westem China. Secondly, thefOundation theory of BOT and the problem that BOT in China have been introduced.Thirdly, the Straegic position, caPital contrie and oPeration mode of private firmswhen they take part in the BOT mode in Western China are put uP with, and by usingthis mode, Mindiang Jiangsheba hydroPOwer station project Which oPeration byHengkong corporation is analyzed. At last, the risk management and risk avoidmeasure are bring forwar fOr private firms When they take part in the BOT mode inWestem China.
Keywords/Search Tags:Westem China, Private Firms, BOT Mode, Infrastructure Building, Risk Avoiding
PDF Full Text Request
Related items