Analysis Of Construction Delay Claims

Posted on:2003-10-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y F WenFull Text:PDF
GTID:2156360092975493Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
The development of the socialism market economy requests our country building industry marketize and internationalize,as demands it carrying out project management according to international tradition,which construction claims is the one most important component of. Research and development of the construction claims not only can give an impulse to the development of our building industry but also can realize our country building marketized and internationalized as soon as possible.The definition of construction claim is investigated and the characteristic,classification,reason and procedure of construction claim are induced. It is beneficial to comprehend construction claim completely.This paper investigates time and fee claimed at the condition of construction delay from contractor angle. As a kind of method expounded of late years that computes the numerical value of time claimed,Dynamic Analysis Method (D.A.M) evaluates delay influence on construction time by contrasting the network condition before delay occurrence with the network condition after delay occurrence. Then,the responsibility aspects are recorded according to the delay types. D.A.M clarifying the delay responsibility aspects and influence effect scientifically and reasonably is indefinite about how to deal with concurrent delay came from different responsibility aspects,which usually takes place in practice. Therefore,this paper expound Improvement upon D.A.M (I.D.A.M) on the basis of loading delay occurrences and responsibility share of concurrent delay,Namely,in combination with the principle of D.A.M,I.D.A.M assays both aspects responsibilities of concurrent delay and influence effect of concurrent delay. I. D.A.M more matches network condition during the actual construction,more satisfies practical demand. Made use of I.D.A.M,an instance is calculated. Theories result coincides with actual condition,which proves the accuracy and maneuverability of I.D.A.M. At the same time,the constitution of item of each fee claimed caused by delays and methods computing the numerical value of fee claimed are analysed in particular.
Keywords/Search Tags:Delay, Time Claimed, Dynamic Analysis Method, Calculation of Dynamic Analysis, fee Claimed
PDF Full Text Request
Related items