Font Size: a A A

Feasibility Research Report For The Urban Sewage Treatment Equipment Project

Posted on:2004-11-12Degree:MasterType:Thesis
Country:ChinaCandidate:L LiuFull Text:PDF
GTID:2156360095953101Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Anterior management is one of important parts in entire process of an project management, and a pivotal link of project anterior management is feasibility research and project evaluation. Feasibility research must be finished before a project' s beginning . Through all-sided analysis, argumentation and evaluation about marketing, resource, technique, economy and society problems relating to a project, it can confirm whether the project should be set up, or can choose the best investing scheme. A project can' t be changed once investing a great deal of fund. Therefore, before a project beginning, we must do feasibility research and project evaluation spending some cost to reduce mistakes of decision-making.This feasibility research report was strict according to the requests of feasibility research, proved the feasibility of the urban sewage treatment equipment Project of Dongfang General Machinery Company from each aspect . First, it emphasized project background, market of urban sewage treatment equipment, producing scale, factory address, construct condition and technique scheme. Secondly, it estimated the total investment, evaluated the making-profit ability, discharging ability and finance risk according to the finance system ofour country and the methods of economic evaluation, analysed the benefit of the project. Finally, it drew a conclusion and brought forward some suggestion to the project owner .The difference between this feasibility research report and an ordinary one is in finance evaluation part . Because the investment included original fixed assets and stock-in-trade , the total income of the project included the income of the urban sewage treatment equipment and the income of original products when proceeding finance evaluation. Therefore, there was also income in the constructing period of the project .In addition, this feasibility research report made a Gantt chart about the project actualizing using Micro-soft Project-2000.
Keywords/Search Tags:urban sewage treatment equipment, feasibility research, project evaluation, finance evaluation
PDF Full Text Request
Related items