Font Size: a A A

The Investment Control Over The Engineering Cost Management Under The Circumstance Of Double Track Run Parallel

Posted on:2005-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:W W LiuFull Text:PDF
GTID:2156360122486599Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
In order to standardize the behavior of price reckoning in engineering constitution's inviting tenders and submitting tenders , and for the sake of tenders and tenders' legal economic interests , it is required that we use a standard , unified and practical price reckoning method. The engineering work load detailed list reckoning method has the advantages of simple , clear , operation easily , remaining the account settlement rarely , etc compared with the present day running unit price budgeting method , which will be the direction of national engineering cost system reform, cost managementFirst , this text states thoroughly the existing problem of the present day national engineering mode and price reckoning method , and the necessity of application right away and the existing problem , and then make a detailed discussion of the principle of quota reckoning and the engineering work load detailed list reckoning , so that we may be safe to draw such a conclusion that the new cost management system of the new price reckoning method is a necessary way to adapt to the international competition . And then several measure to resisting risk are provided with the consideration that every unit will meet with risk after the new engineering work load detailed list reckoning is put into practice . Finally, according to the outcome of Dong's trying out of the detailed list reckoning , and take the practice of the national engineering cost field into consideration, we should set up an environment which is favorable for the application of detailed list reckoning , only in this way can the reform goes deeply and the system of organization innovates smoothly .In this way a new engineering cost system can take shape , which is under the authority's macroscopic control and in an orderly competitive market.
Keywords/Search Tags:quota reckoning mode, engineering work load detailed list reckoning mode, forming complete set environment, risk measure.
PDF Full Text Request
Related items