Font Size: a A A

Building Construction Bidding Boq's Theory And Applied Research

Posted on:2005-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhuFull Text:PDF
GTID:2206360125957361Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
The construction ministry ratifies to national standard issuing implementation ?construction engineering capacity detailed list valuate standard ?GB50500-2003 , and this is a great event that our country built new engineering cost management mechanism.Original one set of engineering cost management system can not suit the needs of market economy development to establishment constantly deepening with the socialism market economy system along with reform , and his reformation is imperative . The engineering is measured the detailed list establishment method and is constructed the application inviting tenders in submitting a tender real, and is to realize the valuate reforming the method that the objective is the most effective .At present , internally having had the part of engineering to have applied the engineering capacity detailed list quoted price , the unified engineering gauge of the whole nation is calculated the rule and also will be put into effect , and the construction is invited tenders , and the completely implementation of the capacity submitting a tender engineering establishment method is can be excpected soon . But, in the real engineering practice , the desperate greater part the construction item still uses traditionally to invite tenders the method submitted a tender, and his cause is studied carefully in unit of construction and construction unit all thinks engineering capacity detailed list quoted price is not easily operated and works the trouble and very hard use etc , chiefly is not too understanding engineering capacity the basic theory and the use method of detailed list quoted price , to the engineering capacity the content , inquiry and technology quota etc of detailed list very indisposedly answer , in addition the construction enterprise does not over a long period of time have the enterprise quota of self, the quota only relying on in now available the trade standard , makes that technology economy analysis and business management are comparatively confusion , indisposedly should newly the engineering cost reforms the situation , therefore , the implementation constructs invites tenders that the capacity submitting a tender the engineering detailed list quoted price has the very big difficulty . This item purport is carried on theory analysis to the engineering capacity detailed list, science and reasonable nature to study his content , and by way of research to the engineering capacity concrete application of detailed list valuate , putting forward corresponding use skill , method and planning , for the management provides the basis capacity carrying out engineering detailed list quoted price and standardizing completely .This item will contribute to the engineering is contracted both sides as well as is engaged in the professional personnel that engineering cost management and consultation were worked , and deepening understanding to ?the construction engineering measure detailed list valuate standard ?further , the control engineering capacity detailed list is invited tenders to submit a tender and the engineering is measured the regulation of detailed list valuate and is asked , for the completely capacity carrying out the engineering detailed list valuate in our country , the promotion engineering cost manages work the development makes positive the contribution.
Keywords/Search Tags:Architectural engineering, Constructing to beckon is submitted a tender, The engineering is measured the detailed list quoted price, Reasonably the low cost is got the bid, Standardizing is managed, Software grinds, The valuate management method
PDF Full Text Request
Related items