Font Size: a A A

The Research Into The System Of Construction Project Legal Person Taking Responsibility In The Social Benefit-based Water Projects

Posted on:2004-09-13Degree:MasterType:Thesis
Country:ChinaCandidate:W Z HuaFull Text:PDF
GTID:2156360122970334Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
The State Planning Commission issued the Temporary Provisions on implementing the System of Construction Project Legal Person Taking Responsibility in 1996. China began an overall implementation of the System of Construction Project Legal Person Taking Responsibility in construction project. With the continuous advancing of the restructuring of market economic systems and the development of construction of water resources infrastructure projects, implementing the System of Construction Project Legal Person Taking Responsibility in social benefit-based water projects becomes a general trend. According to the Temporary Provisions, China tried out the System of Construction Project Legal Person Taking Responsibility in some social benefit-based water projects. But due to the character of the social benefit-based water projects as public goods while the character of the System of Construction Project Legal Person Taking Responsibility as a System of modern enterprise, mplementing the System of Construction Project Legal Person Taking Responsibility in social benefit-based water projects exists a lot of problems.Due to the project character, implementing the System of Construction Project Legal Person Taking Responsibility in the social benefit-based water projects is different from the profit projects. It is necessary to pose a sound system on the construction and management of the social benefit-based water projects, a system with clearing the subject of responsibility as a main line, with strengthening macro-control and improving micro-management as two aspects. The issue of government' s role, the issue of clearing the subject of responsibility, the subject qualifications norm of the project legal person, the inside and outside system of administer should be resovled as key problems.
Keywords/Search Tags:the social benefit-based, water projects, the System of Construction Project, Legal Person Taking Responsibility
PDF Full Text Request
Related items