Font Size: a A A

Problem Analysis And Policy Study On The Well Drilling Project Management Of Jilin Oil Field

Posted on:2006-01-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z Q PangFull Text:PDF
GTID:2166360155454786Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This text analyse the development of Jilin oil field ,such fast developmentwill continue with the growth rate of the annual crude oil of nearly 1 million tons inoutput in five years in the future. In order to meet the fast-developing need, thewell drilling should be close to 10% of the footage growth rate and can just realizethe goal of development of the oil field equally with every year。But the welldrilling project under construction of the oil field of Jilin at present, in a situationthat personnel and equipment operated ceaselessly in the whole year, can't notmerely reach the demand for realizing the development goal , differ greatly withthe expert according to its one's own technology and well drilling ability predictedof equipment situation at the same time .Require too for this reason thatimplements high-efficient management to the well drilling project, should dig well ,dig the good well more, in order to adapt to the goal that its crude oil increasesproduction. And then satisfy economic development of our country's demands forpetroleumImprove the efficiency of the well drilling, will find out the existing problemsoon, this text will be compared and analysed through the trade, it is weak to drawthe well drilling at present of oil field of Jilin, and efficiency is low is because ofthe project management of the well drilling, in institutional framework, contractway , cost predict , well drilling cycle person who predict respect store structure into be unreasonable mainly, question such as being scientific of the means method。Just because of the existence of such question, the contradiction not in conformitywith demand to it of enterprise's development of poor efficiency of the well drillinghas emerged too. In order to solve the contradiction of the existence, really to the oil field welldrilling project existing problem in Jilin, through analysing and researchingcarefully , have proposed solving the countermeasure of the problem.。As to thething that project institutional framework have problem, through draw lessons fromforeign advanced well drilling project organize the management mode, combineJilin oil field actual special circumstances that itself exist , propose well drillingproject of " the Trinity " organize the management mode. This kind of tissue modepasses the application in the area of Fuyu, has obtained the obvious result While analysing that contracts the improvement of the way , have contractedthe way and put forward the fuzzy method to analyse of adopting and implementedcomprehensive appraisal in contracting the project drilling crew of the well drillingto the project of the well drilling, confirm the target of contracting according toappraising the result. Provide and use this kind of method to carry on procedure ,method and instance of comprehensive appraisal to the oil field drilling crew ofJilin here. Can affirm method this proposition can is it offer a kind of scienceappraisal means to contract for well drilling project, offered a kind of effectivescientific method for every homework team of oil field appraisal to consult at thesame time . On the question that Jilin oil field well drilling project cost cycle predictsexistence, this text is it is it study curve law predict to it to use to propose, carry ondiscussion on degree method to predict, prerequisite that use right away at the sametime is it is it prove to state to go on. Can estimate through is it study curve canheavy to improve accuracy that predict to use, and then improve the efficiency ofthe well drilling.
Keywords/Search Tags:Jilin Oil field, Well drilling, Project management, problem and countermeasure
PDF Full Text Request
Related items