Font Size: a A A

A Research On BOT Project Based On Risk Management

Posted on:2006-04-13Degree:MasterType:Thesis
Country:ChinaCandidate:C P SongFull Text:PDF
GTID:2166360155455165Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
As a new project delivering method, BOT (Build Operate Transfer)is being adopted into public infrastructure projects in various ways by governments all over the world. There are many study results since the creation of the concept of BOT, most of which are monographs, monograph of concession contract or risk study and analysis of establishing project. But there's lack of the study based on the benefit of, enterprise and government, the mean participator; shortage of interaction study of factors involved in the BOT mode or theoretic study of BOT mode.Since BOT mode is the construction tendency of public infrastructure projects, as the consultative institution of government of Beijing, in order to provide theoretic and methodological guidance, we think necessarily work should be done on the theoretic study of risk and management of BOT mode.In BOT project, each participator has the probability to gain profit and suffer losses caused by the corresponding risk. Based upon this point, the objective of the study is to analyze how to reasonably distribute and effectively avoid the possible risk to ensure that the BOT project, mostly associated with the national economy and the people's livelihood, can be finished under the schedule in order to help the project company to get prospective cash flow, to gain prospective project profits, as well as to help participated enterprises to achieve profits maximization.First, this thesis makes a systematic categorization of BOT mode, and further to give a detailed analysis of present status of BOT project implement and management, based on which the insufficiency of the present study is given to provide necessary information and research background for the future study.Secondly, concerned with the point that whether the settlement of concession duration is reasonable has great influence on the possible risk probably taken by each participator of the project, this thesis makes a qualitative and quantitive study on the reasonable settlement of concession...
Keywords/Search Tags:BOT, Risk Analysis, Risk Measurement, Win-win Strategy, Risk Distribution
PDF Full Text Request
Related items