Font Size: a A A

Erdos City Dongsheng Area Urban Construction Takes Over The Land For Use And Pulls Down The Research Report

Posted on:2011-09-30Degree:MasterType:Thesis
Country:ChinaCandidate:M WangFull Text:PDF
GTID:2166360305991607Subject:Law
Abstract/Summary:PDF Full Text Request
In recent years, the urbanization process of market of Erdos is obviously accelerated, represented by municipal administration managing, culture, economic center Dongsheng area, With the constant enlargement of the city size, will need to collect the rural collective land of peripheral township, town, village in the city in a large amount unavoidably, removal of the house involved on the land too and other deposit. The field-clearing and building demolishment is a very important previous work in the whole urbanization process, not only concern the broad masses'vital interests but also concern the stability and long-term stability of whole country, the society, Concern local government's public trust in the minds of the people of people. Through collect and pull down, compensate to Dongsheng district government urban construction rural collective land arrange work investigate further this text, summarize successful experience, review the problem existing among them, analyze the reason formed, propose the solution and conductive suggestion, is in the hope of making the urban construction of Dongsheng area take over the land for use to further improve with removal, as to protecting and taking over the land for use conscientiously peasant's legitimate rights and interests have the theory and realistic meaning.
Keywords/Search Tags:Take over the land for use, Remova, Compensate and find a room for, Legitimate rights and interests
PDF Full Text Request
Related items