Font Size: a A A

The Design And Implementation Of Mine Water Inrush Disaster Warning System

Posted on:2015-07-01Degree:MasterType:Thesis
Country:ChinaCandidate:B G JiaoFull Text:PDF
GTID:2181330467486458Subject:Software engineering
Abstract/Summary:PDF Full Text Request
According to the development of domestic and international mine water inrush early warning systems and computer control technology, communication technology and embedded technology, combined with the widespread demand for mine water inrush warning system, this project developed a multi-master architecture and communication way networking mine water inrush warning system, can achieve real-timely, dynamically, systematically and long-term to monitor floods, hydrological.In this paper, combined with micro-controller, monitoring parameters pickup, osmotic pressure sensing principle technology, designed and developed an early warning system of mine water inrush. In this papers,we introduced this system from six parts in detail, first of all, on the basis of mine water inrush basic principles and key technical analysis, completed the overall system design; Secondly, starting from the overall design scheme, detailed analyses the hardware design and software systems design; completed system test and do a detailed analysis of the measured data. Finally, gave a summary of the research, described the main work himself, and pointed out the lack of paper, gave the further work should be done.In this paper,the main job of the work include two aspects:Firstly, analyses and researched the mine flood monitoring parameter information picking technology for effective monitoring of groundwater intelligence system and provided a the oretical support; Secondly, designed and developed the mine water inrush warning system and did a detailed system testing to verify the availability and accuracy of the system.The present system achieve the data measurement requirements based on the analysis of the measurement data, this system has the advantages of high resolution, a wide range of applications, low operating costs, easy maintenance, meet the requirements of high-speed, high-resolution grating, and conducive to the promotion and application of mine water inrush warning system, has a certain value and the practical value.
Keywords/Search Tags:AT89C52, Mine flood, Information pick-up, High accuracy
PDF Full Text Request
Related items