Font Size: a A A

Project Management And Cost Control Of Subway Construction

Posted on:2012-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:H HongFull Text:PDF
GTID:2189330332475793Subject:Project management
Abstract/Summary:PDF Full Text Request
Cost control is a important part in construction of subway projects. How effective cost control, not only to the smooth completion of the project, but also directly affect the construction of the enterprise. With the construction business environment, the tremendous changes have taken place, how to improve cost control, to maximize economic benefits has become a construction enterprises improve their competitiveness in an important way.Construction project management and cost control are complementary, only construction project management in order to control project costs; can only achieve the purpose of project control, construction project management makes sense.Construction cost control approach not only the quantity of materials, quality control, material piled up needed space, and time to approach the number of projects and also on the machinery and equipment rental, maintenance and other control and management, through multi- side control to reduce the construction cost, to protect corporate profits. Therefore, building construction enterprise to strengthen cost control during construction to protect the profits of great significance.
Keywords/Search Tags:subway, cost control, project management
PDF Full Text Request
Related items