Font Size: a A A

Subway Construction Project Cost Control Of State-owned Enterprise Research

Posted on:2016-06-30Degree:MasterType:Thesis
Country:ChinaCandidate:L H ZhengFull Text:PDF
GTID:2309330464462299Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the development of the city, serious traffic jam has become a bottleneck and problems of city development, advocacy and development of city public traffic has been gradually make common sense between the government and citizens. In large and medium-sized city, city track traffic, especially the subway method, as the obvious advantages in safety, punctuality, large capacity, long distance has been more favored by everyone, it’s why the subway construction has entered the rapid development stage. As a state-owned construction enterprises(subway), how to catch the golden opportunity of city subway construction, how to win the contract from the tender, one of the important ways and means is to strength project cost management. Nowdays, to strengthen cost accounting "of subway engineering cost reduction" will become the next major subway enterprise business strategy. This paper mainly discusses the means of improving the work of project cost control, to reduce costs as the goal, through strengthening the control of cost, improve the management level of the subway. In addition, by gradually perfecting the management system, establish a good concept of cost control. Understanding of the core position of subway cost control in enterprises tend to be consistent, healthy development of the cost control system along the standardization, rationalization, internationalization direction. The project of subway enterprises focus is to make the cost control further standardized, scientific development, with the international practice, play a very good investment returns, reduce waste, to achieve sustainable development and improve the competitiveness of enterprises, for enterprises to reduce the cost of metro construction to find a new way.This paper mainly studies on the necessity and the control method of the project cost control of subway. The first chapter mainly describes the research purpose, is the significance of this research. To explore the related theory of cost control in the second chapter, discusses the related theory and method of cost control. The third chapter introduces the concrete construction of Suzhou subway line No. A X standard. The fourth chapter puts forward the problems and optimization suggestions based on the third chapter. The last chapter gives the conclusion and Prospect of the application of the full text, the cost control can effectively reduce the cost of metro engineering construction in subway construction project, Project cost management to realize transition from coarse wild type to intensive, efficient utilization of resource and cost, in promising the quality and the time limilition for a project to maximize the profits of the project.
Keywords/Search Tags:subway engineering, subway project, cost control, construction cost
PDF Full Text Request
Related items