Font Size: a A A

Project Quality Management Research In Daqing Oilfield Motor And Power System Energy Saving Technology

Posted on:2012-10-18Degree:MasterType:Thesis
Country:ChinaCandidate:L Z WangFull Text:PDF
GTID:2189330332497194Subject:Project management
Abstract/Summary:PDF Full Text Request
During the "eleventh five-year plan" of daqing oilfield centering on "40 million tons of continuous and stable", highlighting prevention, positive energy development and application of low carbon technology, in the face of 40 million tons of yield increased difficulties, natural gas development scale, old oil field production equipment aging and oil Wells number increased to realize the grim situation, such as low efficient production safety and environment oilfield, must innovate new technology, explore new mode. Motor and power system is in the process of oil exploration and development is an important part of realization based link, stable oilfield of energy-saving technology important breakthrough. In recent years, oilfield company give oilfield highly energy saving technology research, strengthening support, make its get fast development, full reduce oilfield exploration and development costs. In this environment, all sorts of energy-saving technology versus developed, but the development work of relatively slow, there are many problems and difficulties, and the function is not obvious.Oilfield energy-saving technology research project since 2008, experienced in the development of more than three years, initially formed energy-saving system test method, but during operation is faced with many difficulties and problems, the serious influence and restricted the further promotion of the project. This paper daqing oilfield motor and power system energy saving project of system in detail. Introduces the basic situation of the energy-saving technology based on the basic theory, using project management methods, flow charts of energy-saving technology, project quality management system analysis and study and resolve the energy-saving technology project in the problems in the operation process, thus promoting the healthy development of the project for strategy.This paper firstly energy-saving technology situation and oilfield needs. From the basic theories of energy-saving technology, introduces the source of energy conservation project, technical index, content and meaning, expounds the basic energy-saving technology oil motor situation.Secondly according to project and energy-saving technology in the implementation of project analyzes the problems. Based on the necessity and feasibility of the project implementation based on the analysis of the proposed and analyzed, detailed facing project implementation of quality management system is not perfected, inefficient management, operation mechanism, flawed incentive mechanism is not sound and talent shortage, etc.On this basis, the energy saving technology project quality management and control are studied. Expounds the energy-saving technology project quality management goal, principle, contents and methods of energy-saving technology, from strengthening management quality and the establishment of project quality management and control system, actively carry out project quality evaluation work put forward three aspects of energy-saving technology quality requirements. Through the flowchart method is applied to energy-saving technology projects, from planning, execution, check and acceptance four stages on how to improve the quality of energy-saving technology for specific requirements, expect the effective improve energy saving technology project provides a scientific thinking method. Meanwhile from implementation of continuous quality improvement and strengthening human resources management, increase supervision, establish an objective evaluation system, carry out the daily process sex index evaluation and organize expert evaluation aspects of quality improvement measures proposed project. Finally put forward the countermeasures to further advance the project implementation suggestion. Analyzes the present situation of energy saving technology project progress. Put forward the countermeasures to further advance the project implementation suggestion. One is to establish and perfect the management system and energy-saving technology incentive mechanism. Rationally divided each posts the functional localization, perfect the mechanism, improve incentive mechanism. The second priority is to improve the process of project operation management style. Strengthening the project operation meeting system, bidding system, allowance system.
Keywords/Search Tags:Motor, electric power systems, energy saving, quality management
PDF Full Text Request
Related items