| With the constant perfection of Socialist Market Economy System in China, the management for construction project gradually standardize by the means of the system of juridical person responsibility of project, tendering system supervision system, following audit system. However, there is still problems such as"three exceeding"problem and disjunction of each stage of construction project in Cost Management. At present, the disadvantages of construction project in china are high investment, long investment cycle and a one-time investment. Owing to the disadvantages, the cost management for construction project had to be changed. The establishing of whole Process Cost Management for Construction Engineering Project Management which is suitable for the actual need of china and reducing the cost to improve economic benefit have a great practical significance and theoretical value.In this paper, the present situation of project management and cost management theory are discussed and the main factors which affect project cost management in each stage of construction project (investment decision-making stage, design stage, bidding stage, construction stage, completed stage, after the evaluation phase of the project) are analyzed as well. After seizing the key link which need to be control in each stage of project, the corresponding solution and Control Measures are put forward and actively explore and think on whole Process Cost Management for Construction Engineering Project Management are made. |