A Study On The Supervision Of The GY Hospital Renovation Project

Posted on:2011-01-03Degree:MasterType:Thesis
Country:ChinaCandidate:X M WangFull Text:PDF
GTID:2189330338986341Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The quality , construction, schedule, investment and security control , their aim are the unity of opposites. During construction how to better solve their unity of opposites relationship between them, is the problem to be solved in management project. If you can solve the problem,you can speed up construction schedule, province, fine quality and safety. To view the situation as a whole, our current focus of the project concentrated in quality and safety control .And we have not paid enough attention in control of the investment and construction schedule. However, in project management of the four goals—quality , construction schedule, investment and security control, quality is the most basic goal of the project, security is the guarantee, but the duration and investment is a direct impact of construction project benefits of the investment two major goals. Therefore, investment and construction schedule control effectively can improve a management project.The thesis describe on the project of the GY Hospital of Guangzhou Medical College. From the perspective of management project, analyzed the question of investment and schedule. The main problems in the process control are: Construction may not be expected to geologic risk,The change of manual excavated pile in the pile construction,Owners to design changes altered,The participation of the cause of the unit itself lag,and so on. The main problems in the process schedule are: The unforeseen obstacles and rushed into the hole business increased, Construction units in the bid, pertinently pricing, The policy of government changes, Design phase of the unforeseeable, The design modification,and so on. From these problems, the writer analysis the cause of its, categorize and summarization, put forward some feasible proposal: Construction units to strengthen the management project, including the policy-making stage,the design stage,the tender and bid stage,the construction stage. Improve acting construction system. Reasonable for the construction unit of work. It is necessary to build administrative organ, perfect Industrial law system, transform function of government, accelerate reformation of administrative regulations. According to realities in charge of supervising. Promote the Bill Of Quantities.Then we can sign the contract in a more standardization and rationalization environment.
Keywords/Search Tags:Investment, Construction Schedule, Bill Of Quantities, Acting Construction System, Supervision Sector
PDF Full Text Request
Related items