| The project of Changchun mails handing center is approved by nation post station. The engineering project was started in 2001, while it was formally used in 2002. The project purpose is to draws the final evaluation results, such as: successful experiences and suggestions etc., which could be obtained by evaluating the implement process, technologic technology, investing benefit and social benefit of the engineering of Changchun mails handing center. We could improve management and decision level according to the evaluation results of the engineering. Moreover, the model of the post construction after-evaluation of Jilin province is also discussed.1. The implement steps of Changchun mails handing center after-evaluation project. The engineering project is made up of architecture process, construction equipments installation, equipments match and technological equipments installation. According to the whole construction procedure, the after-evaluation of the project is performed, which based on the information such as: the prophase information, equipment and material purchase, implement phase and function profit. Therefore we establish the implement steps which based on the engineering character, including the after-evaluation scope and details, experts group composing, information collection and local investigation, after-evaluation report establish and conclusions feedback.2. Establish the standard system of Changchun mails handing center project after-evaluation2.1 Changchun mails handing center after-evaluation project is divided into four sub-objectives: implement process, technologic technology, investing benefit and social benefit according to the general project evaluated and character of the engineering for mails handing. To convenience evaluation, the sub-objective is made up the first and second standard, respectively. The details... |