Font Size: a A A

The Study Of Management System Of The Xiaolangdi Multipurpose Dam Project Management Bureau

Posted on:2008-01-26Degree:MasterType:Thesis
Country:ChinaCandidate:T YangFull Text:PDF
GTID:2189360212973597Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
The Xiaolangdi Multipurpose Dam Project, which is mainly for flood control, ice-jam prevention, sediment reduction, but also water supply, irrigation and power generation, is a key control dam project for harnessing the Yellow River floods and maintaining the Yellow River health. Having completed project construction, the Xiaolangdi Multipurpose Dam Project Management Bureau, the Employer, performs scientific management and meticulous operation by giving first priority to social services, such that the Project has produced outstanding social benefits in flood control, ice-jam prevention, water supply, flood/sediment regulation, and flow maintenance in the lower reaches of the Yellow River, and provided considerable economic benefits as well.This paper discusses the special nature of the Xiaolangdi Multipurpose Dam Project as a quasi- public service scheme, analyze the applicability of its mode of organizational management and special legal person system to the management system of multipurpose water resources projects by referring to the experience in foreign water project management, and dwells on the merits and demerits of the Xiaolangdi Multipurpose Dam Project Management Bureau to be operated as an institution or enterprise under the current management system and legal framework. Based on a theoretical analysis of the project management system, it further analyzes the development circumstances,...
Keywords/Search Tags:Xiaolangdi Multipurpose Dam Project Management Bureau, sustainable development, quasi-public service water management, special legal person system
PDF Full Text Request
Related items