Font Size: a A A

The Application And Research Of Project Progress Management In Construction Schedule Of Shenzhen's Electrical Power Transmission And Substation Projects

Posted on:2008-10-03Degree:MasterType:Thesis
Country:ChinaCandidate:C G XiaFull Text:PDF
GTID:2189360215970726Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the rapid development of economy, the supply of electric power can't catch up with the demand, so we accelerate the construction of electric power to fulfill this. With the characteristics of high concentration of money and technique, related with many different aspects and long construction period, unavailable storage and regional power supply. So it is needed to think for future, regulate with science, design with rationality, and manage entirely construction for the construction of power station. At the same time it is needed to strengthen management and execute the bid law strictly for the completion with process, quality and security of the project.Combined with the power transmission and substation construction project, the thesis described basic theory of project schedule management from the concept, planning and execution. The thesis also introduced network technique that is often used in construction. Shenzhen electric power company developed network management system of power transmission and substation project with the aid of project management software, and made great progress in engineering and construction.This paper use WBS model to analysis the Shenzhen power engineering's structure, and use TOC theory to plan the power engineering's plan.The text has combines the theory with reality, which is study valuable in certain application. The main content of the thesis relates to the author's real job at present and some research results have already been applied to the real work of electric project management. We make efforts to find some technology to restrain bottleneck in the future in this research.
Keywords/Search Tags:electrical power transmission and substation projects, progress management, P3 software
PDF Full Text Request
Related items