Study On Agent-Based Approach Of Project Schedule Management

Posted on:2007-12-30Degree:MasterType:Thesis
Country:ChinaCandidate:S H ZhaoFull Text:PDF
GTID:2189360215995077Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Modern project management technology and tools provide scientific method and means for construction project management. The application scope of project management information system is constantly extending along with the wide application of computer and information technology inconstruction and engineering practice. As the development of our country's economy and the consummating of market-economy system gradually. Many construction corporations are facing the much opportunity, but at same time, they are facing muchdifficulty, such as profit-ratio dropping, higher technique. So it becomes more important how to construct more reasonably to subdue the cost.After looking up much material , the article has done much work, the first generalizing the system of net-plan , illuminating the means of making the construction-plan more preferential, controlling means, PERT technology and optimizing, and has done much work in researching the optimization of time deeply.The article researched the knowledge of agent system and multi-agent system. According to the character of the construction project process plan and the multi-agent, the article developped a multi-agent framework to excutive the project process.The article has done much work in researching the cooperation mechanism of multi-agent system. On the basis of analyzing five common cooperation mechanism, it developped a new negotiation approch, and use it to make the cooperation and negotiation policy. In the method, the agent entirely applied its autonomy, socialiability, recativity and other characters.
Keywords/Search Tags:project process plan, time optimization, cooperation mechanism, multi-agent system
PDF Full Text Request
Related items