Font Size: a A A

Study On BT Model Of Public Infrastructure Projects

Posted on:2008-12-10Degree:MasterType:Thesis
Country:ChinaCandidate:L TongFull Text:PDF
GTID:2189360218459903Subject:Public Management
Abstract/Summary:PDF Full Text Request
Public infrastructure facilities is the foundation of national economy. Entering 21century,with entering WTO, China becomes more international, national economy remainsdeveloping rapidly. The level of urbanization raises continually. The bottleneck action ofpublic infrastructure facilities to economic development is outstanding day by day. So, it is apressing matter of the moment to strengthen the building of public infrastructure facilities.The paper analyses the present situation that the lack of funds for construction onpublic infrastructure facilities and the inefficiency of management. It points out that generaladoption of the market principle reform must be enforced. Introducing theories of projectclassification and marketability into it, the paper introduces some management models whichare used in different kinds of public infrastructure facilities, including BOT model, projectacting build model, BT model. The paper analyses the concept, apply scope, basic characters,significance, financing pattern, process, capital management and so on. Meanwhile, itanalysis the problems that exists in the use of MT model in China. It points that BT model isnot equal to paying before contract, the model that investor is constructor has bothadvantages and disadvantages. How to control construction cost and quality of projects?How to invade repurchase risk?To deal with the outstanding problems existing, The paper puts forward a proposal ofBT financing project acting build model on these questions. Basing on project permissioncontract, the government enters into contract with contractor. The contractor replaces theowner to management with adopting financing pattern, assumes main assignment. Thegovernment repurchase by stages after building. The project is governed by government,project consultant company, bank and Insurance Agency in order to evading risk. In thismodel, under the legal subject, it achieves the purpose of governing together and perfects theproblems of BT model to its limit. It is the most important part of the paper.Finally, the paper gives the cases of asses project of Shanghai external ring tunnel,reconstruction of Shanghai subway Line 1 south station, project of the changjiang riverbridge in Chongqing Caiyuan Dam to make a authentic proof analysis. Showing thesuperiority of BT model, deficiency in practice and advice related.
Keywords/Search Tags:Public infrastructure facilities, BT model, financing
PDF Full Text Request
Related items