Font Size: a A A

The Universities Engineering Application The Life Cycle Cost Analysis Method Research

Posted on:2008-05-17Degree:MasterType:Thesis
Country:ChinaCandidate:M Y LiFull Text:PDF
GTID:2189360242467053Subject:Civil Engineering Management
Abstract/Summary:PDF Full Text Request
The Life-Cycle-Cost Analysis method (LCCA) based on the technical economics and the value engineering theory, application system thought, conducts the analysis research the LCC of the construction items. It is one effective analysis method for the project plan decision-making, the expense monitoring and the expense plan. This method has the imoprtant significance for saving the construction investment, reducting the LCC of the construction items. This article has studied how to introduce the LCCA method in the university engineering project, specifically dividing eight aspects:(1) Introduction the research actuality of the LCCA method of the domestic and foreign;(2) Analyzing the goal of the LCCA method and the realization method;(3) Analyzing the university architectural engineering (mainly to refer to dormitory building project and office building project), equipment installation the LCC decomposition structure;(4) Analyzing the university project specifically to apply the LCC management pattern;(5) Analyzing how to decide the the essential parameters of the university project to apply the LCCA method;(6) Analyzing the universities project, equipment installation the project LCCA model and its the optimization;(7) Using the foregoing model, calculating some university the representative 3 dormitories building and 2 office buildings the LCC;(8) Taking the air conditioning equipment purchase as the example, analyzing how to apply the LCCA method to carry on the plan decision-making.In the research, this article has used the value engineering, the system simulation and the engineering economics related method.This article innovates including following eight aspects:(1) Proposing the university construction project and equipment installation project the LCC decomposition structure;(2) Proposing how to specifically apply the LCCA analysis method management model in the university project; (3) Proposing how to determine some essential parameters of the university project in applying LCCA analysis method;(4) Proposing the universities project LCCA method model as well as the model optimization;(5) Introduction the LCCA method application through the examples, calculation some university the representative 3 dormitories building and 2 office buildings the LCC;(6) Taking the air conditioning equipment purchase as the example, analyzing how to use the LCCA method to carry on the plan decision-making;(7) Induction the university buildings the entire life cycle various stages each part expense relations;(8) Forming the universities engineering the LCC least analysis computation model.
Keywords/Search Tags:LCC, LCCA Model, Example Analysis
PDF Full Text Request
Related items