The Study Of The Application Of The Project Management In The Air Preheater Project Cost Control

Posted on:2008-04-27Degree:MasterType:Thesis
Country:ChinaCandidate:G H ZhangFull Text:PDF
GTID:2189360242476598Subject:Project management
Abstract/Summary:PDF Full Text Request
Based on the analysis of internal and external environment of SA Company. Illustrated the necessary that enterprises adopt the low cost strategy. And stated the concept and characteristic of project management, to give emphasis to the theory of the project cost control. Based on the analysis of the situation of cost control of the air-preheater, concluded the phrases of design and manufacture are the key chain. Use the examples of the apply of value engineering method and cost accumulative curve technique in air-preheater design and manufacture. Illustrated the feasibility of the project cost control applied in the air-preheater project. These methods provide useful information for the applying the project cost control in the enterprises.Firstly this paper explain what is air-preheater and its market situation. Analyzed the necessary of executing the low cost strategy for the enterprises, intramurally that help enterprises to survive and develop and externally to adapt the development of environment. Following to state the development , concept and characteristic of the project management, and the project cost control methods. then drawled the methods of the value engineering and the cost accumulative curve technique that the thesis researched.Secondly analyzed the situation that the enterprise adopt the target cost. Concluded the reason for the defect of target cost control is that the base team lost control. So it is necessary to apply the level target cost management. And then the analyzed the factors that affect the cost control, suggested to use the project management methods to control the cost in the design and manufacture phases.Finally set an example of air-preheater design, to use the value engineering method to control the cost. On the design phase of the air-preheater, the cost got controlled , that supply the methods and theory. Set the examples of the rotor post assembly and module assembly to explain how to apply the key route method and the net optimize technique to control the air-preheater cost. Use cases to proof that the cost accumulative curve technique and network optimize technique can be applied to manufacture phase of air-preheater to control the cost.
Keywords/Search Tags:air preheater, project management, cost control, value engineering method, the cost accumulative curve technique
PDF Full Text Request
Related items