Font Size: a A A

A Study Of BT Mode For Urban Mass Transit Infrastructure Project Financing

Posted on:2009-04-04Degree:MasterType:Thesis
Country:ChinaCandidate:M WangFull Text:PDF
GTID:2189360242989541Subject:Management
Abstract/Summary:PDF Full Text Request
Development with industrialization the urban mass transportation faces unprecedented development opportunity face our country, which will become the biggest infrastructure construction in the cities ever since. However , the single government public finance investment method as our country tradition , can't afford the funds the huge urban mass transportation construction needed at face , also limited our country the development of the urban mass transportation . In order to adapt the society economy development, lead the market funding method has become an inevitable trend of the urban mass transportation development in the urban mass transportation construction.The BT pattern is the financing way of public project that is used in the specific condition. The BT pattern is a huge systems engineering because the financing structure of the BT pattern is quite complex and multitudinous loan contracts, guarantee contracts an construction contracts are involved in the BT project financing .In order to improve project construct management system, build consummate project construct management marketable competitive structural, reduce government capital pressure. This dissertation systematically has studied the BT pattern following several aspects:(1) This dissertation has analyzed the development characteristic and the existing financing mode of the urban mass transportation project in our country and proposed that project financing is the development tendency of the urban mass transportation based on introducing the financing development of foreign urban mass transportation.(2) This dissertation has discussed correlational concept and essential characteristic of BT pattern and analyzed the differences with other financing ways and the function and question of BT pattern in the construction of the urban mass transportation.(3) This dissertation has analyzed of the characteristic of BT pattern in the construction of the urban mass transportation. Through studied the Beijing Olympic urban transportation BT pattern, this dissertation has improved project construct management system, built consummate project construct management marketable competitive structural.(4) This dissertation has analyzed the risk division and risk types of BT pattern and proposed the method and measure of preventing financing risk.Widely consulting the example of the urban mass transportation, this dissertation has raised reasonable propose of management and policy.
Keywords/Search Tags:Urban Mass Transit Infrastructure, Financing, BT Pattern
PDF Full Text Request
Related items