Font Size: a A A

Research On The Bidding Strategys Of Guodian ShuangYaShan Power Plant

Posted on:2008-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:L X ZhangFull Text:PDF
GTID:2189360245475645Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In the region electric power market initial period,the generation manufacturer faced with the more intense market competition because the correlation rule is imperfect and the network restraint is serious. The generation manufacturer need solution the question how formulated the quoted price strategy. This paper researches the question which is bidding strategy of Guodian Shuangyashan generates limited company in region electric market. The first ,we analyze bidding data of this company in contract market , obtained this company's cost curve. The paper uses the Cournot model in game theory to analyze the income of generation manufacturer in cooperation and non-cooperation. It is the conclusion that only when this company used the cooperation way to competitive can avoid risk on which the network restraint brings in the northeast region electric market initial period. The second, the combination quoted price model of generation manufacturer which considerated the contract market and spot market has established under the medium and long-term frame of the northeast region electric market. From avoiding the risk on which the network restraint brings, the paper establishes the model to minimize the risk rate to solve the bidding quantity in the different market.
Keywords/Search Tags:Region electricity market, Bidding strategy, Spot market, Contract market
PDF Full Text Request
Related items