Font Size: a A A

The P3 Software Applied Research Of The Project Progress Control In The Transmission Improvement Project

Posted on:2009-06-19Degree:MasterType:Thesis
Country:ChinaCandidate:B HanFull Text:PDF
GTID:2189360245475728Subject:Project management
Abstract/Summary:PDF Full Text Request
P3 software had a high popularity at home and abroad. The use of P3 software or not was treated as a measure of project management level in many countries'government departments.Based on the theory of the control of the project progress, analyzed the methods and means about the modern project management. Discussed the important meaning about the progress of the project management to the power construction projects, combined with six cycle road impracticable transmission improvement project, put forward using the P3 software to prepare the project progress plans, and established the WBS model, Discussed in detail how to control, track and adjust the transmission improvement project, Confirmed the P3 software as a professional project management software, be powerful, able to provide a strong support for the management of the project progress. But also found the problems about the practical application of P3, through analysis, put forward methods and recommendations such as enhancing attention, strengthening management, constructing system and so on.
Keywords/Search Tags:project management, progress control, P3 software
PDF Full Text Request
Related items