Chongqing Yuan Wang Construction Enterprise To Prevent The Risk Of Research Projects Linked

Posted on:2009-12-22Degree:MasterType:Thesis
Country:ChinaCandidate:X L ZhangFull Text:PDF
GTID:2189360272474055Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Yuan Wang Chongqing Construction Co., Ltd. is a 40-year-old enterprise, with housing construction general contracting level, the municipal public works general contracting, and so on a wide range of construction quality. Bid for all types of large and medium-sized projects to receive a number of honors, the city of Chongqing is a well-known construction companies.Yuan Wang's project linked from the beginning of 2000 into the company, linked to the 2007 project revenue reached 85% of revenues, on the one hand, the introduction of projects linked to the company's earnings to increase to a certain extent help, on the other hand, to Yuan Wang brings a big loss. The analysis projects linked to the Yuan Wang's loss is mainly due to bring the following aspects: the first is the lack of credit, including those linked to the construction side and the credibility of the case, the funds, linked to rely on the side of the story; Second, due to excessive believe that the ability to link it to relax the construction contract for the construction of the second assessment and management, efficiency of the lower part of the link project, it is difficult from a loss situation; Yuan Wang is the third company did not monitor the project's production process , To participate in the management of the project to control the duration of the construction project, quality, safety, and the final is not set up a strict system of funds to pay and cost analysis system to link it to effectively oversee the use of construction funds, with the result that some linked to the transfer of funds to Yuanwang company debt disputes.At present, competition in the construction industry, such sighted companies do not link it to participate in business enterprises in the competition could be eliminated, but linked project management in accordance with the current status quo, if not to establish the necessary link it to prevent the risk of project management, project linked very May be looking to bring greater losses, the establishment of a set of projects linked to prevent the risk management measures becomes more urgent.Based on the characteristics of the operation and management of the construction industry, drawing a number of good projects linked risk management experience as a project that will link the project to the whole process of self-management, linked the project to strengthen the prevention of risk management measures, it is possible to link it to reduce the risk of the project The. The first is linked to the establishment of staff looking into the scope of management's labor contract, to avoid the risk of violation of construction laws, and the other is linked to the establishment of building a side of the credit system of strict evaluation of building construction contract terms, conditions ban on building Into the project's market; The third is to appoint the necessary on-site management such as technical director, the quality of administrators, security, financial supervision and so the production of the project, is a four-establish a strict management system suppliers to ensure that projects linked debt clear , Construction funds for construction projects.Link it to prevent the risk of the project is the core of the requirements of companies looking to participate in the project linked the whole process of management, link it to prevent the risks brought about by the project. I hope this article on the project linked companies looking to reduce the risk of a certain role in helping at the same time have linked the project to other construction companies have a reference.
Keywords/Search Tags:construction companies, calling the project, risk management, system development
PDF Full Text Request
Related items