Shenyang Institute Of Engineering New Campus Construction Cost Control

Posted on:2010-05-06Degree:MasterType:Thesis
Country:ChinaCandidate:S L DangFull Text:PDF
GTID:2189360272997672Subject:Project management
Abstract/Summary:PDF Full Text Request
Starting in 1999,the state relaxed the number of institutions of higher education enrollment,higher education in China entered a stage of rapid development.China's higher education from elite education to gradually transition to the popularization of education,colleges and universities have been expanding school.For the popularization of higher education in China entered the final stage of a foundation. However,the existing educational resources institutions of higher learning far from enough to meet the teaching needs and the provisions of the Higher Education Ministry of Education standards.The original campus is located downtown in general, small campus,the campus has no external space for expansion,plus the city's land acquisition costs and other reasons,colleges and universities in order to pursue their own development,away from the city center in the urban fringe or traffic location in a good position to rural areas,development zones,or better prospects for development in other areas to open up the second campus,the expansion of school size,the implementation of remote school the majority of colleges and universities has become the only way to go development.In particular,in recent years,the construction of the new campus of the University as the rapid rise of the general economic development zone,building up the climax of the new campus.Colleges and universities faced with such a large scale of investment in new campus construction,almost all the colleges and universities are faced with this problem:the scale of investment几个亿at least as many as several billion;both to report back in September before the new school needs Therefore,a shorter construction period,construction cycle,lack of cost control difficulties;colleges and universities themselves less infrastructure management,and have not experienced such a large-scale construction tasks,the lack of experience is fatally flawed,it is almost cost control blind spot,just know to go over a small area,we have neglected the more important stage of pre-feasibility study and design stage.Caused by the construction of new campus more mistakes cost control.In this paper,Shenyang College of Engineering,the construction of the new campus of the process of cost control as an example,the implementation of construction projects in accordance with the sequence of stages of research and cost control to explore in detail to clarify the various stages of cost control methods and strategies.1,in the new campus building of the impact of the feasibility study stage of the project cost can be up to 80%~90%.From site selection,financing,construction scale scientific identification,equipment and materials targeting the price level,the overall level of positioning,etc.to consider.Have to rely on the guidance of experts, to have a scientific attitude,the general guiding principle is:to apply to,economic, security,simple principle of building a unique century-old university.2,the design phase of the impact of the project cost more than 75%.In order to control costs at the design stage,the monomer in the overall design and creative design of the introduction of "closed expert evaluation method",and described the specific method of operation.Also introduced the method of limits and the advantages and disadvantages of the design put forward to limit the application of value engineering the design of the concept of distribution,the monomer solution to the problems the design of the project limits.3,the design of the bidding stage is the outcome of the real manifestation of a reasonable cost.However,it must be serious and strict implementation of tendering procedures to prevent a serious price tag in excess of reasonable limits.In this paper,based on the actual experience of bidding methods and proposed the use of College personnel in the sector scoring method of study, choose a strong and reputable construction companies,in practice to obtain good results.In this paper,the specific methods of operation.4,the construction phase and audit the accounts of the impact of supervision on the project cost only 5%~25%. This shows that the new campus is the key to cost control and design decision-making. especially decision-making stage is the most important decision of project cost,a direct impact on decision-making phase of the various construction phases of project cost control is scientific,reasonable question.However,pre-construction phase is the design of the specific decision-making and the implementation phase,project cost control is to control changes and the need for reasonable.Follow-up audit is to address this stage of the better cost control methods.The article elaborated on the specific method of tracking the audit,but also on the process of auditing the accounts of the key to cost control and the solution.In this paper,in accordance with the Shenyang Institute of Engineering at all stages of building the new campus of the cost control method,the construction of the new campus of colleges and universities can be an effective cost control.However, because the situation is different in various colleges and universities,colleges and universities should be in accordance with the actual situation of their own,specific analysis of specific issues,this article only as a college campus building in the new reference for colleagues draw.
Keywords/Search Tags:Shenyang Institute of Engineering, New Campus building, The implementation of the various stages of, Cost Control, Methods and Research
PDF Full Text Request
Related items