Font Size: a A A

The Analysis Of Safety-Health-Environment Project Management In Liao Cheng Power Plants

Posted on:2010-06-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2189360275453108Subject:Project management
Abstract/Summary:PDF Full Text Request
The security production and management has been a core content of the generators, it also can improve the market competitiveness of generators.The NOSA integrated five star system is a systematic framework for the management of safety,health and the environment.It combines the three parts advanced and scientific.In this paper,the theory of project management,combined with the actual situation in generators,is analyzed for implement the feasibility and the necessity.According to the project management-related business processes,the key points of the bringing to the system are given.Finally,Combined the actual situation of the plant in Liaocheng,the relevant work of NOSA integrated five star system implement are introduced.With the results of verification,it has achieved good results.It provides the ideas and methods for other generators leading into the NOSA system,it also enhances the integrated management of generators level in the right direction.
Keywords/Search Tags:NOSA management, project management, generators
PDF Full Text Request
Related items