The Study On Pre-evaluation Of Construction Project Of Bengbu No.2 Power Plant

Posted on:2010-02-17Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhaoFull Text:PDF
GTID:2189360275484915Subject:Project management
Abstract/Summary:PDF Full Text Request
In the project analysis and decision-making process of investment, the pre-evaluation of construction project has a very important position and role ,it is an essential work processes in decision-making process and it provides direct evidence for projects.This article described the research background and the technical line; in details introduced the pre-evaluation theory; discussed the need for construction projects; from the transportation, water resources, geology, storage yard, and other aspects to analyze of the project site selection; expounded the project fuel sources, fuel quality and fuel and transportation fuel conditions; systematically analyze the project investment, carried out a analysis of the economic benefits and sensitive; gave a comprehensive evaluation of the project's environmental protection and comprehensive utilization of resources of the measures; finally, came to the conclusion that the construction of Nanyang Yahekou No.2 power plant projecct is reasonable and feasible.
Keywords/Search Tags:power projects, before the evaluation, site selection, investment estimates
PDF Full Text Request
Related items