| The deeper reform of the power system,the more competition between power plant.Reducing cost of generation effectively,heightened safe coefficient of power set and enhanced economy benefit become the main target of generation corporations.The main method is reducing house service consumption rate and control the cost which can reach through assist set remolding.The passage does some research about condensate pump in Datong power generation.Through looking up references and study on the spot,it analyses the running status and the problems.It analyses the need of converter remolding from theory and its technical evaluation.Comparing input and output of reconstruction item,it evaluated the benefit after transformation,then drawn a conclusion. |