Font Size: a A A

The Technical Economic Estimate Of 110kV Electric Transmission And Transformation Project In BaoTou Equipment Park

Posted on:2010-06-09Degree:MasterType:Thesis
Country:ChinaCandidate:F QiaoFull Text:PDF
GTID:2189360275953107Subject:Project management
Abstract/Summary:PDF Full Text Request
As the basic industrial,electric grid project is significant to national economy development.Technical and economic evaluation sustains electric grid project.This paper analyzes the principle,process,estimate system of the technical estimate and the content, principle,method,estimate system of the economic estimate.Then,researches the system, plan,scope of 110kⅤElectric Transmission and Transformation Project in BaoTou Equipment Park.Calculates estimate financial target of this project.This paper analyzes no determinacy of this project.Based on a comprehcnsivc analysis,the paper draws a projcct that technology is feasible,economical and reasonable。So the study on this problem is of great realistic significance,The results show that technical and economic evaluation will play an active role in the scientific decision and improving project's performance.
Keywords/Search Tags:Electric Transmission and Distribution circuit, Requirement Analysis, Economic Evaluation
PDF Full Text Request
Related items