Font Size: a A A

The Study Of Project Time Management On VOLAN Cement Clinker Line Infrastructure

Posted on:2009-02-04Degree:MasterType:Thesis
Country:ChinaCandidate:G L ZhangFull Text:PDF
GTID:2189360275984788Subject:Project management
Abstract/Summary:PDF Full Text Request
In market economy conditions,time is money,efficiency is life.A project can be completed within the scheduled time,are one of the most important part with projects, but also for project management of one of the objectives pursued.Through analysis of VOLAN cement 5000T/D clinker production line of the time management of infrastructure projects,construction of the project for more job numbers,the structure of different types of characteristics such as the construction process and reasonable arrangements,to take synchronous operation,assembly-line construction and other means of;At the same time,the use of WBS methods,schedule network diagram and critical path method,the time resource optimization method,such as technical means, you can optimize the 5000T/D clinker production line construction network diagram, identify the key scientific and reasonable route,and through special problems analysis to identify the scientific response measures.All of these domestic 5000T/D clinker production line of the building units and the contractor have important practical significance.
Keywords/Search Tags:infrastructure projects, time management, network diagram, critical path, procedures
PDF Full Text Request
Related items